Home > Diary > Renovation Status So Far

Renovation Status So Far

The other home is currently under-going renovations but here’s the progress so far.

Kitchen

I can smell the kitchen almost ready in a week or two time. What’s missing are the kitchen cabinets & a little more touch-up to the kitchen toilet.

Living Room (Before Moving More Furniture Out)

What has the Living Room got to do with renovation status since I’m not renovating the Living Room at all?

Actually I just took some random shots to show the mess the living room is in. I just moved move furniture out from the room to the living room and hence, the living room is packed like the below.

Living Room (After Moving More Furniture Out)

Master Bed Room

We’ll be changing the tiles of the master bed room, as well as the tiles of the other rooms. Tiles changing will take around 2 to 3 weeks to complete. After which we’ll be re-painting the walls of the home.

Everything should be completed by hopefully, 2nd week of July.

Related Posts By Moi

Categories: Diary Tags:
CommentLuv Enabled
:alien: :angel: :angry: :blink: :blush: :cheerful: :cool: :cwy: :devil: :dizzy: :ermm: :face: :getlost: :biggrin: :happy: :heart: :kissing: :lol: :ninja: :pinch: :pouty: :sad: :shocked: :sick: :sideways: :silly: :sleeping: :smile: :tongue: :unsure: :w00t: :wassat: :whistle: :wink: :wub: